My Basket £0.00

Spend another £500.00 for Free Delivery

You May Also Need...

Shopping List

What are you looking for?

Tell us what products you’re looking for and we’ll tell you everything else you’ll need.

Bath

Toilets

Basin

Showers

Enclosures

Heating

Objekt Ceramica Objekt Ceramica Logo
Product Image
  • Splide Slide
  • Splide Slide
Thumbnail ImageThumbnail Image

SKU: LASBEP

Linea L-Shape 700mm Shower Bath End Panel (11490)

RRP £63.00
£49.00
SAVE 22%
Discount Icon 11% OFF YOUR ORDER* WITH MAYOFFER11
MAYOFFER11
00
Days
00
Hours
00
Mins
00
Secs

Enjoy a generous 11% discount with code MAYOFFER11. Hurry, grab your savings now!

*Excludes Spot Offers

Limited Stock Only 4 Left
  • Clock Icon In Stock For Immediate Dispatch
  • Call Us: 02895442577
  • Pallet Icon Medium
  • Box Icon 30 Day Returns
£49
Product Details
  • Essential finishing touch for L-shaped shower bath
  • Durable acrylic construction for long-lasting use
  • Glossy white finish brightens and modernizes the space
  • Hides pipework and bath underside for a sleek look
  • Compatible with the Linea L Shaped Shower Bath range
  • Easy installation with secure fitting
  • 5-Year Guarantee for peace of mind
  • Adds a polished, modern touch to your bath

Product Information

Linea L-Shape 700mm Shower Bath End Panel

Complete your L-Shape Shower Bath with the end panel.

The finishing touch to your L-shaped bath, this end panel will seal together the whole look. Although small in size, it is much more than a added touch, it is necessary for achieving the overall completed look of you shower bath. It is made from a sturdy and durable acrylic to ensure excellent durability. The glossy white finish will also provide a brightness to your space, along with adding to the overall modern look of your shower bath. Complete your bath shower with this polished white panel in a high quality acrylic in order to hide the unsightly pipework and underside of the bath for an overall sleek and modern look.

Made for the Linea range.

This product features all the dimensions that make it compatible with the Linea L Shaped Shower Bath range. The panel is easy to fit and secure so you can get enjoying your new shower bath sooner rather than later.

If you're still not sold.

This product comes supplied with a 5 Years Guarantee in order to ensure complete customer satisfaction so you know you'll be getting the most out of your bath panelling.

Signature Features:

  • Essential finishing touch for L-shaped shower bath
  • Made from durable, high-quality acrylic for longevity
  • Glossy white finish adds brightness to your space
  • Sleek design hides unsightly pipework and bath underside
  • Complements modern aesthetics with polished white appearance
  • Compatible with the Linea L Shaped Shower Bath range
  • Easy to fit and secure for quick installation
  • Helps create a complete, cohesive bath shower look
  • Designed for durability and long-term performance
  • Provides a smooth, seamless look to your shower bath
  • 5-Year Guarantee ensures customer satisfaction and peace of mind
  • Adds a modern touch while maintaining functionality

Technical Drawing
More Information
Brand Objekt Ceramica
Colour White
Height 500mm
Width 700mm
Material Acrylic
Spec Sheet download Link
Technical Sheet download Download

Reviews


Frequently Asked Questions

What is this product made from?

This product is made from a hardwearing acrylic.

What is the purpose of this product?

This product will complete the look of your shower bath by protecting the underside of the bath from splashing, along with hiding any unsightly pipework

Is this product of a good quality?

Yes, the product is manufactured with an acrylic that makes for excellent quality.

Is this bath end panel durable?

The excellent quality of the acrylic means that this product provides a great level of durability.

What type of bath is this panel compatible with?

This product is compatible for use with the Linea range of square shower baths.

How do I clean this product?

Thanks to the glossy white acrylic finish, simply wipe over the product every so often and it will be kept sparkling clean.

Does this product offer a quality guarantee?

Yes, this product comes supplied with a 5 Year Guarantee in order to ensure customer satisfaction.

Delivery Information

Location Shipping Method Shipping Charges
Mainland UK Standard Delivery £10.99
Northern Ireland Standard Delivery £10.99
Republic of Ireland Standard Delivery £10.99