My Basket £0.00

Spend another £500.00 for Free Delivery

You May Also Need...

Shopping List

What are you looking for?

Tell us what products you’re looking for and we’ll tell you everything else you’ll need.

Bath

Toilets

Basin

Showers

Enclosures

Heating

Objekt Ceramica Objekt Ceramica Logo
Product Image
Clearance
  • Splide Slide
  • Splide Slide
  • Splide Slide
  • Splide Slide
Thumbnail ImageThumbnail ImageThumbnail ImageThumbnail Image

SKU: LSHAPE-LH15

Linea 1500mm L-Shape Shower Bath, Front Panel & Screen - Left Hand (15532)

RRP £615.00
£349.99
SAVE 43%
Discount Icon 10% off* clearance items with CLEAR10
CLEAR10
00
Days
00
Hours
00
Mins
00
Secs

Save an extra 10% on clearance items—use code CLEAR10!
*Other discount codes do not apply to clearance items.

Limited Stock Only 1 Left
  • Clock Icon In Stock For Immediate Dispatch
  • Call Us: 02895442577
£349.99
Product Details
  • Left Hand
  • Space Saving
  • Modern Shower Bath
  • Includes Hinging Shower Screen
  • Includes Bath Panel
  • High Grade Acrylic

Essential Add-ons (3)

Product Information

Linea 1500mm L-Shape Shower Bath, Front Panel & Screen - Left Hand 

Sturdy acrylic construction that's smooth and warm to the touch along with a versatile modern look make this a highly practical shower bath that reflects a modern taste.

Why Choose a Shower Bath?

A savvy and increasingly popular choice for modern style bathroom suites, shower baths combine all the benefits of shower enclosures and baths into one attractive, space saving unit.

Signature Features

  • Space Saving
  • High Grade Acrylic
  • Includes Hinging Bath Screen
  • Includes Bath Panel
  • Taps & Waste Sold Separately
  • Supplied Undrilled for Tapholes
  • End Panel Not Included - Sold Separately

Peace of Mind?

This stylish bath comes with a 5 Year Manufacturer's Guarantee meaning you can enjoy your luxury bath for longer!

Technical Drawing
More Information
Brand Objekt Ceramica
Bath Height 400mm
Bath Width 855mm
Bath Length 1500mm
Bath Shape L-Shape
Bath Style Modern
Bath Type Shower Bath
Bath Tap Mount Undrilled for Taps
Material Acrylic
Waste Supplied No
Spec Sheet download Link
Technical Sheet download Download

Reviews


Frequently Asked Questions

Delivery Information

Service

Small Deliveries

Medium Deliveries

Large Deliveries

Mainland UK - Standard Delivery

2-3 days from dispatched

£6.99

£10.99

£49.99

Northern Ireland - Standard Delivery

Next working day from shipping

£6.99

£10.99

£29.99

Please note products we do not hold in stock will take longer to be delivered. Please contact us for more accurate delivery times if you need your order urgently.