| Colour | White |
| Brand | Bathshack |
| Bath Type | Shower Bath |
| Bath Width | 700mm |
| Bath Length | 1700mm |
| Toilet Height | 748mm |
| Toilet Width | 382mm |
| Toilet Depth | 635mm |
| Basin Depth | 460mm |
| Basin Width | 555mm |
| Basin Height | 845mm |
| Tap Type | Filler |
| Suite Type | Bath Suites |
| Colour | White |
| Brand | Bathshack |
| Bath Type | Shower Bath |
| Bath Width | 700mm |
| Bath Length | 1700mm |
| Toilet Height | 748mm |
| Toilet Width | 382mm |
| Toilet Depth | 635mm |
| Basin Depth | 460mm |
| Basin Width | 555mm |
| Basin Height | 845mm |
| Tap Type | Filler |
| Suite Type | Bath Suites |
| Colour | White |
| Brand | Viktor Benson |
| Bath Height | 515mm |
| Bath Width | 700mm |
| Bath Length | 1700mm |
| Bath Shape | P-Shape |
| Bath Style | Modern |
| Bath Type | Shower Bath |
| Bath Tap Mount | Undrilled for Taps |
| Bath Width Widest | 850mm |
| Material | Acrylic |
| Capacity ltrs | 220 Litres |
| Waste Supplied | No |
| Colour | Chrome |
| Brand | Eliseo Ricci |
| Tap Depth | 148mm |
| Tap Height | 141mm |
| Tap Width | 180mm |
| Tap Style | Modern |
| Tap Holes | 1 Tap Hole |
| Tap Type | Mixer |
| WRAS Approved | Yes |
| Swivel Spout | No |
| Finish | Chrome |
| Max Pressure | 5.0 bar |
| Min Pressure | 0.5 bar |
| Waste Supplied | No |
| Material | Brassware |
| Brand | Eliseo Ricci |
| Colour | Chrome |
| Height | 530mm |
| Width | 70mm |
| Length | 84mm |
| Material | Brass |
| Colour | White |
| Brand | Nuie |
| Basin Depth | 460mm |
| Basin Height | 845mm |
| Basin Shape | Rectangular |
| Basin Style | Modern |
| Basin Tap Mount | 1 Tap Hole |
| Basin Width | 555mm |
| Material | Ceramic |
| Colour | Chrome |
| Brand | Eliseo Ricci |
| Tap Depth | 131mm |
| Tap Height | 150mm |
| Tap Width | 52mm |
| Tap Style | Modern |
| Tap Holes | 1 Tap Hole |
| Tap Type | Mixer |
| WRAS Approved | Yes |
| Swivel Spout | No |
| Finish | Chrome |
| Max Pressure | 5.0 bar |
| Min Pressure | 0.1 bar |
| Waste Supplied | No |
| Material | Brass |
| Brand | Eliseo Ricci |
| Colour | Chrome |
| Material | Brass |
| Colour | White |
| Brand | Nuie |
| Toilet Depth | 635mm |
| Toilet Height | 748mm |
| Toilet Pan Height | 380mm |
| Toilet Width | 382mm |
| Toilet Seat | Standard |
| Toilet Shape | Round |
| Toilet Style | Traditional |
| Material | Ceramic |
| Brand | Objekt Ceramica |
| Colour | White |
| Height | 500mm |
| Width | 700mm |
| Material | Acrylic |